View Single Post
Old 11-14-2007, 01:16 PM   #30 (permalink)
sploke
ladies love country boys
 
sploke's Avatar
 
Join Date: May 2006
Location: Eastern CT
Posts: 398
Default

So, thats pretty much a recap of everything done so far. My order from Big Al's came in today, so I get to play with that stuff tonight. It looks like I am going to be able to run the 30gal on the sump system, I'm just going to have to get creative with the overflow setup. My overflow boxes should be here hopefully tomorrow. The 150 has cleared up, and I'm really liking the new gravel - its sort of the color of Fluorite, but a bit less red maybe, and larger particles. Next big part is getting aluminum frames welded up for the other 150, then I can move that in place and start looking at drywall.
__________________
Current project

"So long, and thanks for all the fish."
sploke is offline   Reply With Quote
 
Page generated in 0.09966 seconds with 8 queries